NO PROJECT PERIOD CLIENT REMARK
1.  LAY-OUT ACCOMMODATION BARGE “INDOPACIFIC PERDANA”  SEPTEMBER, 2001  PT. INTIPLATINDO PERDANA – MAXUS  ON CALL
2.  INCLINING TEST, INTACT & DAMAGE STABILITY ANALYSIS FPSO “SEA-GOOD 101  SEPTEMBER,2001  PT. BUKAKA TEKNIK UTAMA – MAXUS  ON CALL
3.  PIPE LINE TRANSPORTATION ANALYSIS 2 (TWO) SHIPEMENT  SEPTEMBER,2001 PT. MERLA SAKTI – MAXUS  ON CALL
4.  FINITE ELEMENT ANALYSIS BARGE “SALIKI 16”  NOVEMBER, 2001  PT. SURVEYOR INDONESIA – MEDCO ENERGY  ON CALL
5.  LOAD OUT PROCEDURE, BALLASTING, TIE-DOWN DESIGN PROJECT KE-40 PLATFORM  MARCH, 2004  PT. ADIGUNA – CNOOC  ON CALL
6.  LOAD OUT PROCEDURE, BALLASTING, TIE-DOWN DESIGN PROJECT INTAN BPC PLATFORM  MARCH, 2004  PT. ADIGUNA – CNOOC  ON CALL
7.  LIFTING PROCEDURE AND TIE-DOWN GAS COMPRESSOR MODULE  JULY, 2004  PT. INDOTURBINE- CNOOC  ON CALL
8.  LOAD OUT PROCEDURE AND TIE-DOWN, LASHING & SECURING DESIGN GAS COMPRESSOR MODULE  JULY, 2004  PT.SANGGAR SARANA BAJA – CNOOC  ON CALL
9.  INTACT & DAMAGE ANALYSIS, AND LONGITUDINAL STRENGTH BARGE 180FT “ENGSON”  FEBRUARY, 2006  PT. GUNANUSA UTAMA FABRICATORS – TOTAL  ON CALL
10.  BARGE STRENGTH CHECK & STABILITY ANALYSIS DURING LOAD OUT, PROJECT SNPS-SISI NUBI, BARGE “EASTERN NOVA”  JUNE, 2006  PT. GUNANUSA UTAMA FABRICATORS – TOTAL  ON CALL
11.  LONGITUDINAL STRENGTH CHECK & STABILITY ANALYSIS DURING LOAD OUT, PROJECT JACKET VR-A ON BARGE “SEA FOSTER” AND JACKET VR-B ON “LABROY 249” SEPTEMBER, 2006  PT. GUNANUSA UTAMA FABRICATORS – BP.TANGGUH  ON CALL
12.  TRANSPORTATION ANALYSIS AND TIE-DWON DESIGN KE-30 WELL PLATFORM CW, DW KODECO PROJECT  APRIL, 2006  PT. ADIGUNA – KODECO  ON CALL
13.  TRANSPORTATION ANALYSIS AND TIE-DWON DESIGN KE-40 WELL PLATFORM KODECO PROJECT  AUGUST, 2006  PT. ADIGUNA – KODECO  ON CALL
14.  BARGE  STRENGTH CHECK & STABILITY INTACT AND DAMAGE, PIPELINE ON BARGE “MARCOPOLO 222”  JULY, 2006  PT. GUNANUSA UTAMA FABRICATORS – TOTAL  ON CALL
15.  LOAD OUT PROCEDURE, BALLASTING, TIE-DOWN DESIGN PROJECT KE-38 JACKET & DECK WELL PLATFORM, BARGE “BOX-TIGA”  JUNE, 2007  PT. ADIGUNA – KODECO  ON CALL
16.  LOAD OUT PROCEDURE, BALLASTING, TIE-DOWN DESIGN PROJECT KE-38 DECK, CONDUCTORS, CAISSONS, PIPING WELL PLATFORM, BARGE “BOX-TIGA”  JUNE, 2007  PT. ADIGUNA – KODECO  ON CALL
17.  LOAD OUT PROCEDURE, BALLASTING, TIE-DOWN DESIGN PROJECT KE-38 JACKET WELL PLATFORM, BARGE “BOX-ENAM”  JUNE, 2007  PT. ADIGUNA – KODECO  ON CALL
18.  LOAD OUT PROCEDURE, BALLASTING, TIE-DOWN DESIGN PROJECT KE-32 JACKET WELL PLATFORM, BARGE “SANTOSO 15”  JUNE, 2007  PT. URAWA-PT.PAL-KODECO  ON CALL
19.  ENGINEERING ANALYSIS FOR TOWING PROCEDURE, BOLLARD PULL, STABILITY OF FSO MT. “MUTIARA” FROM SEPANJANG ISLAND TO BATAM.  JUNE, 2007  PT. SUCOFINDO-EMP KANGEAN  ON CALL
20.  STRENGTH ANALYSIS FOR INERGEN FIRE SUPPRESION SKID#1 AND SKID#2  JUNE, 2007  PT. ODG WORMALD INDONESIA – TOTAL  ON CALL
21.  LONGITUDINAL STRENGTH CHECK & STABILITY ANALYSIS DURING LOAD OUT, PROJECT DECK VR-A AND DECK VR-B ON BARGE “EASTERN NOVA”  FEBRUARY, 2007  PT. GUNANUSA UTAMA FABRICATORS – TOTAL  ON CALL
22.  INSPECTION OF M/T. “OVERSEAS COLMAR” IN MALAYSIA AND WESTERN ANCHORAGE IN SINGAPORE  JUNE, 2007 PT. SUCOFINDO (PERSERO)
JAKARTA
 ON CALL